Consider shortening the process
Check a configuration omitting post-treatment rinsing against the target material and equipment conditions.
Related keywords
Consider pretreatment that reviews post-treatment rinsing, through to drying.
This pre-coating treatment agent uses a sealing method as an alternative to phosphates. Consider the relevant phosphorus- and fluorine-free system together with water savings and reviews of heating and cleaning burdens. Even in a configuration omitting rinsing after treatment, upstream cleaning and rinsing and drying after treatment still require confirmation.
Consider this agent when reducing water use or cleaning burdens in the pretreatment process, or comparing with existing iron-phosphate treatment.
Clarify which parts of the process can be shortened and evaluate performance on dried components and the completed coating film including the topcoat.
Check a configuration omitting post-treatment rinsing against the target material and equipment conditions.
The state of degreasing and upstream rinsing affects treatment and subsequent coating.
Manage drying after treatment as a required step and evaluate topcoat compatibility.
With this method, consider rinsing after degreasing separately from the steps after sealing. It does not mean omitting rinsing throughout the process while leaving upstream contamination or carryover in place.
Insufficient drying or pooled liquid after treatment may affect subsequent coating. Check adhesion and corrosion resistance under a specification that includes part geometry, drainage, drying, and the selected coating.
Confirm which steps can be omitted and manage the remaining cleaning, rinsing, and drying.
Please share the current process, water-use and cleaning issues, and drying conditions. Consultation can begin by sharing the conditions and organizing the documents and evaluation items needed to assess suitability. The scope of support for testing, implementation, and supply is confirmed individually.
Introduces adhesion to the substrate, moisture at the interface and stresses within a coating film.
Introduces how conversion coatings relate to adhesion and corrosion protection and the differences between treatment methods.
Why read this: To examine the relationships between oil, dirt, surface preparation, wettability and coating film adhesion.
Why read this: To investigate cratering and foreign matter through substrate surface condition, preparation and environment as well as the paint.
Why read this: To check the chemical SDS and conditions for handling, ventilation and protective equipment.
It does not eliminate the entire process. Check the process conditions for the specific method, including upstream rinsing and drying after treatment.
Please share the current process, water-use and cleaning issues, and drying conditions. You are welcome to consult us using whatever information is currently available.
When contacting us, please quote Reference ID: 1-058
Copy the text below, add your on-site situation and send it to us via the Contact page.
You can summarize the situation on site and what you want to confirm even before choosing a product.
A: This service is designed to propose high-value-added Japanese paints to customers and efficiently deliver them to your doorstep.
A: Paint Voyager is a service that suggests high-value-added Japanese paints and enables efficient procurement even in small quantities.
A: We leverage our trusted relationships with Japanese paint manufacturers to efficiently source a wide range of paint products from Japan.
A: Yes, we offer a range of support beyond paints, providing various materials to help you achieve your coating requirements.
A: We have a fully-equipped hazardous material warehouse and comply with fire prevention regulations to safely store and supply hazardous materials, providing support for safe handling and procurement.